Stabilization of Lerini and Bugjoni Streams
Detailed design of stabilization of Lerini and Bugjoni streams through design and construction of gabion dikes, avoiding the…
Detailed design of stabilization of Lerini and Bugjoni streams through design and construction of gabion dikes, avoiding the…
Rehabilitation of the irrigation canals of Fullqet, Capi and Suka in Mati and Dibra regions. The project consists…
Detailed design for rehabilitation of Midha Dam (19 m high), Derjan Dam (12 m high) and Gurra Dam…
Detailed design for rehabilitation of Irrigation Systems in Murriz-Thana and Divjaka Schemes in Lushnje region. The project consists…
Project Preparation Feasibility Studies and Preliminary Design for Sewerage Systems and Wastewater Treatment Plants in Kosovo for Prishtina,…
Preparation of the detailed design for Vlora secondary and tertiary sewerage collection system and Ksamili Sewerage Collection system.…
Project Preparation Feasibility Study for Kamza Water and Wastewater Development Project –KfW
Preparation of the detailed design for Extension of Kavaja WWTP. The existing KfW financed Kavaja WWTP was designed…
Preparation of the detailed design for Extension of Sewerage System in Golemi Area, Kavaja. The project includes detailed…
Detailed design and tender documents according the EU procedures of Sewerage System of Industrial Area of Shkodra City.…