Midha Dam, Derjan Dam & Gurra Dam

Detailed design for rehabilitation of Midha Dam (19 m high), Derjan Dam (12 m high) and Gurra Dam (13 m high). The project consists of the geological and geotechnical investigation of the existing dams, evaluation and assessment of the existing embankment slides and the design for rehabilitation of the slides, intakes, bottom outlet structures as…

Irrigation Systems in Murriz-Thana and Divjaka

Detailed design for rehabilitation of Irrigation Systems in Murriz-Thana and Divjaka Schemes in Lushnje region. The project consists of the rehabilitation of Krutje main canal (length 22.3 km and capacity 13.2 m3/sec), two branches of total length of 21 km and capacities 3.5 and 1.5 m3/sec, Terbufi main canal (capacity 6.7 m3/sec) and two branches…

Extension of Kavaja WWTP

Preparation of the detailed design for Extension of Kavaja WWTP. The existing KfW financed Kavaja WWTP was designed for a capacity of25 000 people equivalent. With this extension the capacity is increased with 50 000 people equivalent. The project is having a cost of 4.4 mill. Eur and is financed by IPA 2010.

Sewerage System in Golemi Area, Kavaja

Preparation of the detailed design for Extension of Sewerage System in Golemi Area, Kavaja. The project includes detailed design for Collection system – secondary and tertiary pipelines, hydraulic model and dimensioning of the pipelines with total investment cost of 4.2 Mill. Eur. The design preparation is financed by IPF 2 and implementation by Albanian Government.