Detailed Design for Hydropower - Devoll
A coordinated design programme for run-of-river hydropower schemes across six Albanian catchment areas. The assignment covered schemes in the upper Devoll, Strelca, Dunica, Dragostun, Zalli i Xhuxhes, Shëngjini and Germani catchments. All plants were conceived as run-of-river systems without flow regulation, requiring careful integration of intake, conveyance, generation and grid-connection structures.
