← Back to portfolioDevoll, Albania / 2020

Design for HPPs of the Devolli Catchment

Design support for three major hydropower plants forming a renewable-energy cascade along the Devoll river. The Devoll Hydropower development comprises three plants with an approximate installed turbine capacity of 278 MW and projected annual generation of 790 GWh. EBS and its hydraulic expert worked jointly with Norwegian consultancies Norconsult and Multiconsult. EBS later commissioned Banja HPP and supervised works at Moglica HPP.

Devolli Hydropower Catchment
Devoll, Albania2020