Feasibility Study and detailed design for Hydropower development in Seta River Catchment Project which includes 3 HPPs with total capacity of 17 MW. All HPP’s are based on runoff river flows without flow regulation. The main structures under these HPP projects consist on: Intake Dam crossing the river, sedimentation tanks, pressure basins, headrace pipe (penstock), power house and turbines installed with transmission headlines to the substations.
Share this post