Preparation of the detailed design for Extension of Sewerage System in Golemi Area, Kavaja. The project includes detailed design for Collection system – secondary and tertiary pipelines, hydraulic model and dimensioning of the pipelines with total investment cost of 4.2 Mill. Eur. The design preparation is financed by IPF 2 and implementation by Albanian Government.
Share this post