Detailed design for rehabilitation of Irrigation Systems in Murriz-Thana and Divjaka Schemes in Lushnje region. The project consists of the rehabilitation of Krutje main canal (length 22.3 km and capacity 13.2 m3/sec), two branches of total length of 21 km and capacities 3.5 and 1.5 m3/sec, Terbufi main canal (capacity 6.7 m3/sec) and two branches 26 km long. The total length of secondary and tertiary irrigation canals is about 140 km for both main canals, Divjaka irrigation scheme with two pumping stations with capacity about 2 m3/sec and 19 km pressure transmission pipes. The total cost of the investment is about 11 mill. USD. The project is financed by the World Bank.