PS Moglica Extension (1620 MW)

2030

PS Moglica Extension (1620 MW)

EBS provided Feasibility Study, ESIA (Local Consultant with Tractebel and Multiconsult) services for this hydropower & dams assignment in Maliq, Albania.

LocationMaliq, Albania
Project categoryHydropower
Services Delivered
Topographic Survey&Feasibility Study&ESIA

Project overview

Project details

Overview

PS Moglica Extension (1620 MW): Pumped-storage scheme, 550 m gross head, dam (145 m, CFRD)

The assignment was delivered for Devoll Hydropower Sha (Statkraft AS) during exp. 2030.

Services & scope

  • Feasibility Study
  • ESIA
  • Hydraulic and civil engineering integration
  • Dam, intake and water-conveyance assessment
Periodexp. 2030
ClientDevoll Hydropower Sha (Statkraft AS)
LocationMaliq, Albania