Fierza HPP Downstream Protection

2020

Downstream Protection - Fierza HPP Dam

A protection design developed to reduce erosion, slope-instability and flood risk downstream of the Fierza hydropower dam.

LocationKukës, Albania
Project categoryFlood Protection · Hydropower
Role
Topographic Survey&Detailed Design

Project overview

Project details

Overview

Spillway discharges had eroded sections of the left bank beside the tailrace channel, creating a risk of slope failure, channel blockage and increased water levels near the powerhouse.

EBS designed protection works to preserve safe powerhouse operation during flood releases and improve the future stability of the riverbank.

Services & scope

  • Downstream erosion and slope-risk assessment
  • Left-bank stabilisation design
  • Tailrace-channel protection measures
  • Flood-discharge operating-condition review
AssetFierza HPP
RiskBank erosion
Protected systemTailrace channel
Primary roleDetailed design