Porto Romano Integrated Port Water Systems

2023

Porto Romano Integrated Port Water Systems

EBS provided Detailed Design services for this water & sanitation assignment in Durres, Albania.

LocationDurres, Albania
Project categoryWater Supply & Sanitation
Role
Topographic Survey&Detailed Design

Project overview

Project details

Overview

Integrated Port of Durres in Porto Romano – Design of the external water supply network for firefighting, for drinking water supply, for the removal of polluted waters and their treatment, rainwater drainage

The assignment was delivered for Taulant Shpk during 01/2023 to 10/2023.

Services & scope

  • Detailed Design
  • Hydraulic and infrastructure assessment
  • Coordination with utility and public-sector stakeholders
  • Buildable technical documentation
Period01/2023 to 10/2023
ClientTaulant Shpk
LocationDurres, Albania
Construction value~ € 2.6 mln