2030
PS Moglica Extension (1620 MW)
EBS provided Feasibility Study, ESIA (Local Consultant with Tractebel and Multiconsult) services for this hydropower & dams assignment in Maliq, Albania.
LocationMaliq, Albania
Project categoryHydropower
Role
Topographic Survey&Feasibility Study&ESIA
Project overview
Project details
Overview
PS Moglica Extension (1620 MW): Pumped-storage scheme, 550 m gross head, dam (145 m, CFRD)
The assignment was delivered for Devoll Hydropower Sha (Statkraft AS) during exp. 2030.
Services & scope
- Feasibility Study
- ESIA
- Hydraulic and civil engineering integration
- Dam, intake and water-conveyance assessment
Periodexp. 2030
ClientDevoll Hydropower Sha (Statkraft AS)
LocationMaliq, Albania