Moglica HPP (184 MW)
EBS provided Tender Design (Local Consultant with Multiconsult and Norconsult), Permitting & Licencing, Supervision (main Supervisor of the project and sub-Consultant with Sweco Norge AS for tunnel works) services for this hydropower & dams assignment in Maliq, Albania.
LocationMaliq, Albania
Project categoryHydropower
Role
Topographic Survey&Bathymetric Survey&Tender Design&Permitting & Licensing&Supervision
Project overview
Project details
Overview
Moglica HPP (184 MW): Impoundment HPP - consisting of Moglica dam (145 m, rock-fill asphalt core)
The assignment was delivered for Devoll Hydropower Sha (Statkraft AS) during 2019.
Services & scope
- Permitting
- Hydraulic and civil engineering integration
- Dam, intake and water-conveyance assessment
- Powerhouse and grid-interface coordination
- Dam construction and quality supervision
- Spillway structure monitoring
- Underground powerhouse coordination
- Technical reporting and site interface management
- Drill-and-blast tunnel supervision
- Tunnel-boring machine works oversight
- Derivation and bottom-outlet tunnel coordination
- Joint technical reporting with SWECO Norge
- Survey control and field-data acquisition
- Georeferenced surface or depth modelling
- Quality control and spatial-data processing
- Engineering-ready survey deliverables
Period2019
ClientDevoll Hydropower Sha (Statkraft AS)
LocationMaliq, Albania