Moglica HPP (184 MW)

2019

Moglica HPP (184 MW)

EBS provided Tender Design (Local Consultant with Multiconsult and Norconsult), Permitting & Licencing, Supervision (main Supervisor of the project and sub-Consultant with Sweco Norge AS for tunnel works) services for this hydropower & dams assignment in Maliq, Albania.

LocationMaliq, Albania
Project categoryHydropower
Role
Topographic Survey&Bathymetric Survey&Tender Design&Permitting & Licensing&Supervision

Project overview

Project details

Overview

Moglica HPP (184 MW): Impoundment HPP - consisting of Moglica dam (145 m, rock-fill asphalt core)

The assignment was delivered for Devoll Hydropower Sha (Statkraft AS) during 2019.

Services & scope

  • Permitting
  • Hydraulic and civil engineering integration
  • Dam, intake and water-conveyance assessment
  • Powerhouse and grid-interface coordination
  • Dam construction and quality supervision
  • Spillway structure monitoring
  • Underground powerhouse coordination
  • Technical reporting and site interface management
  • Drill-and-blast tunnel supervision
  • Tunnel-boring machine works oversight
  • Derivation and bottom-outlet tunnel coordination
  • Joint technical reporting with SWECO Norge
  • Survey control and field-data acquisition
  • Georeferenced surface or depth modelling
  • Quality control and spatial-data processing
  • Engineering-ready survey deliverables
Period2019
ClientDevoll Hydropower Sha (Statkraft AS)
LocationMaliq, Albania