Banja HPP (73 MW)

2016

Banja HPP (73 MW)

EBS provided Tender Design (Local Consultant with Multiconsult and Norconsult), Permitting & Licencing, Commissioning services for this hydropower & dams assignment in Cerrik, Albania.

LocationCerrik, Albania
Project categoryHydropower
Role
Topographic Survey&Bathymetric Survey&Tender Design&Permitting & Licensing&Commissioning

Project overview

Project details

Overview

Banja HPP (73 MW): Impoundment HPP - consisting of Banja dam (80 m, gravel-fill clay core)

The assignment was delivered for Devoll Hydropower Sha (Statkraft AS) during 2016.

Services & scope

  • Commissioning
  • Permitting
  • Hydraulic and civil engineering integration
  • Dam, intake and water-conveyance assessment
  • Embankment dam commissioning support
  • Intake, tunnel and penstock verification
  • Spillway systems review
  • Powerhouse readiness and interface coordination
  • Survey control and field-data acquisition
  • Georeferenced surface or depth modelling
  • Quality control and spatial-data processing
  • Engineering-ready survey deliverables
Period2016
ClientDevoll Hydropower Sha (Statkraft AS)
LocationCerrik, Albania