Dragostunje HPP Cascade (8 MW)

2014

Dragostunje HPP Cascade (8 MW)

EBS provided Feasibility Study, Detailed Design, ESIA, Permitting & Licencing services for this hydropower & dams assignment in Librazhd, Albania.

LocationLibrazhd, Albania
Project categoryHydropower
Role
Topographic Survey&Feasibility Study&ESIA&Detailed Design&Permitting & Licensing

Project overview

Project details

Overview

Dragostunje HPP Cascade (8 MW): 4 Diversion HPPs

The assignment was delivered for VORTEK Shpk during 2014.

Services & scope

  • Feasibility Study
  • Detailed Design
  • ESIA
  • Permitting
Period2014
ClientVORTEK Shpk
LocationLibrazhd, Albania