Zalli i Xhuxhes HPP Cascade (6 MW)

2024

Zalli i Xhuxhes HPP Cascade (6 MW)

EBS provided Feasibility Study, Detailed Design, ESIA, Permitting & Licencing, Supervision services for this hydropower & dams assignment in Mirdite, Albania.

LocationMirdite, Albania
Project categoryHydropower
Role
Topographic Survey&Feasibility Study&ESIA&Detailed Design&Permitting & Licensing&Supervision

Project overview

Project details

Overview

Zalli i Xhuxhes HPP Cascade (6 MW): 2 Diversion HPPs

The assignment was delivered for HEC ZALL XHUXHË Shpk during 2024.

Services & scope

  • Feasibility Study
  • Detailed Design
  • ESIA
  • Permitting
Period2024
ClientHEC ZALL XHUXHË Shpk
LocationMirdite, Albania