2023
Libohovë Solar PV Plant - 93 MWp
EBS provided Feasibility Study, ESIA, Detailed Design, Licensing Documentation for MIE & Permitting Documentation services for this renewable energy assignment in Libohove, Albania.
LocationLibohove, Albania
Project categorySolar & Wind
Role
Topographic Survey&Feasibility Study&ESIA&Detailed Design&Permitting & Licensing
Project overview
Project details
Overview
Ground-mounted PV Plant (93 MWp) in Libohove Adm. Unit
The assignment was delivered for Faethon Shpk (GEK Terna, Greece) during 2023-2025.
Services & scope
- Feasibility Study
- Detailed Design
- ESIA
- Licensing Documentation for MIE
- Survey control and field-data acquisition
- Georeferenced surface or depth modelling
- Quality control and spatial-data processing
- Engineering-ready survey deliverables
Period2023-2025
ClientFaethon Shpk (GEK Terna, Greece)
LocationLibohove, Albania