Lumbardhi HPP Cascade (14 MW)
EBS provided Feasibility Study, Detailed Design services for this hydropower & dams assignment in Decan, Kosovo. Lumbardhi HPP Cascade (14 MW): 2 Diversion HPPs The assignment was delivered for Kelag GmbH during 2016.

EBS provided Feasibility Study, Detailed Design services for this hydropower & dams assignment in Decan, Kosovo. Lumbardhi HPP Cascade (14 MW): 2 Diversion HPPs The assignment was delivered for Kelag GmbH during 2016.
