Lumbardhi HPP Cascade (14 MW)

2016

Lumbardhi HPP Cascade (14 MW)

EBS provided Feasibility Study, Detailed Design services for this hydropower & dams assignment in Decan, Kosovo.

LocationDecan, Kosovo
Project categoryHydropower
Services Delivered
Topographic Survey&Feasibility Study&Detailed Design

Project overview

Project details

Overview

Lumbardhi HPP Cascade (14 MW): 2 Diversion HPPs

The assignment was delivered for Kelag GmbH during 2016.

Services & scope

  • Feasibility Study
  • Detailed Design
  • Hydraulic and civil engineering integration
  • Dam, intake and water-conveyance assessment
Period2016
ClientKelag GmbH
LocationDecan, Kosovo