2014
Dragostunje HPP Cascade (8 MW)
EBS provided Feasibility Study, Detailed Design, ESIA, Permitting & Licencing services for this hydropower & dams assignment in Librazhd, Albania.
LocationLibrazhd, Albania
Project categoryHydropower
Services Delivered
Topographic Survey&Feasibility Study&ESIA&Detailed Design&Permitting & Licensing
Project overview
Project details
Overview
Dragostunje HPP Cascade (8 MW): 4 Diversion HPPs
The assignment was delivered for VORTEK Shpk during 2014.
Services & scope
- Feasibility Study
- Detailed Design
- ESIA
- Permitting
Period2014
ClientVORTEK Shpk
LocationLibrazhd, Albania