Moglica HPP (184 MW)
EBS provided Tender Design (Local Consultant with Multiconsult and Norconsult), Permitting & Licencing, Supervision (main Supervisor of the project and sub-Consultant with Sweco Norge AS for tunnel works) services for this hydropower & dams assignment in Maliq, Albania. Moglica HPP (184 MW): Impoundment HPP - consisting of Moglica dam (145 m, rock-fill asphalt core) The assignment was delivered for Devoll Hydropower Sha (Statkraft AS) during 2019.
