Extension of Kavaja WWTP

Preparation of the detailed design for Extension of Kavaja WWTP. The existing KfW financed Kavaja WWTP was designed for a capacity of25 000 people equivalent. With this extension the capacity is increased with 50 000 people equivalent. The project is having a cost of 4.4 mill. Eur and is financed by IPA 2010.

Sewerage System in Golemi Area, Kavaja

Preparation of the detailed design for Extension of Sewerage System in Golemi Area, Kavaja. The project includes detailed design for Collection system – secondary and tertiary pipelines, hydraulic model and dimensioning of the pipelines with total investment cost of 4.2 Mill. Eur. The design preparation is financed by IPF 2 and implementation by Albanian Government.