Preparation of the detailed design for Extension of Kavaja WWTP. The existing KfW financed Kavaja WWTP was designed for a capacity of
25 000 people equivalent. With this extension the capacity is increased with 50 000 people equivalent. The project is having a cost of 4.4 mill. Eur and is financed by IPA 2010.
