Detailed Project Design and Project Supervision of the first Floating Solar Power Plant in Albania. E.B.S shpk became part of this innovative project in which Statkraft is for the first time testing floating solar power at a hydropower plant in Albania. The project is comprised of four units of 0.5 MWp, with a total installed capacity of 2 MWp and it is has a total investment cost of EUR 2.3 million.