Feasibility Study and detailed design for Hydropower development in Luma River Catchment Project which includes 5 HPPs with total capacity of 31 MW. All HPPs are based on runoff river flows without flow regulation. The main structures under these HPP projects consist on: Intake Dam crossing the river, sedimentation tanks, pressure basins, headrace pipe (penstock), power house and turbines installed with transmission headlines to the substations.

Share this post