Feasibility Study and detailed design for Hydropower development in Lunik RiverCatchment Project which includes 4 HPP’ with total capacity of 15 MW. All HPP’s arebased on runoff river flows without flow regulation. The main structures under these HPPprojects consist on: Intake dam crossing the river, sedimentation tanks, pressure basins,headrace pipe (penstock), power house and turbines installed with transmission headlinesto the substations

Share this post