Detailed design for protection of downstream side of Qyrsaqi Dam in the Vau i Dejes HPP. The discharges from the Qyrsaqi Spillway have eroded the left bank of the river in different section risking the urban areas to be flooded. The project will stop the progress of the erosion during the spillway operation and stabilize left bank for safe operation in the future.
Share this post