Supervision of the Underground works in Moglica HPP in Joint Venture with SWECO NORGE Consulting Company. The underground works consist in about 12 Km tunnels (7 km of the tunnel is opening by drill and blast method whereas 5 km by TBM method), 1200 m derivation tunnel (Lower and upper bottom outlet tunnels), etc.
Share this post