Preparation of the detailed design for Vlora secondary and tertiary sewerage collection system and Ksamili Sewerage Collection system. The project consists of the design of about 45 km pipelines, 6 pumping station for Ksamili and transmission main of Ksamili to Saranda about 4 km. The cost of the project was 6.7 mill. Eur
Share this post