Supervision of the Moglica Dam
Supervision of the Moglica Dam (145 m high), Spillway structure and underground power house of Moglica HPP. The supervision activities are ongoing.
Supervision of the Moglica Dam (145 m high), Spillway structure and underground power house of Moglica HPP. The supervision activities are ongoing.
Supervision of the Okshtuni dam (64 m high), RCC Dam, Spillway structure andgrouting works. The activities are ongoing.
Commissioning of Banja HPP (installed power 73 MW) structures: Banja Embankment Dam 80m high, Intake and derivation tunnel penstock, Spillway and Power House.
Supervision of the Underground works in Moglica HPP in Joint Venture with SWECO NORGE Consulting Company. The underground works consist in about 12 Km tunnels (7 km of the tunnel is opening by drill and blast method whereas 5 km by TBM method), 1200 m derivation tunnel (Lower and upper bottom outlet tunnels), etc.